Project Planning & Scheduling

  • Primavera P6

  • Microsoft Project

What the right scheduling can do for you:

Quickly and easily identify the critical path of your project.

  • Improve efficiency for your Critical Path Project Management and development.

  • Integrate cost and schedule records from all areas of your project staff.

  • Plan for upcoming events with daily, weekly, and monthly projections, so you know what needs to be done.

  • Schedule construction projects.

  • Ensure successful project delivery with budget controls. I help you with changes, estimates, and other variables.

  • Prepare alternative plans during construction by anticipating changes and understanding key variables.

  • Keep detailed notes on known issues and problems within the project plan to ensure an accurate summary. Import and export crucial project data. This protects your project and reduces stress when possible issues occur during the project’s lifespan.

Perry & Blackwelders, Madinat Jumeriah, Dubai

What 1324 can do for you and your company:

  • Construction scheduling using either Primavera P6 or MS Project.

  • Projects from conception, tender, initialisation, monitoring through to completion.

  • Full CPM methodology. Single or multiple critical paths.

  • Work can be customized to your needs. Should you only need scheduling, or in combination with resource loading and/or costing.

  • EOT claims.

  • Tracking and monitoring of all site instructions, procurement, weather, delays.

  • Look Ahead Schedules at a frequency of your choosing.

  • Respond promptly with swift turnaround time.

  • Tailor make a package that suits your needs.

Benefits of Project Controls & Scheduling

  • Monitor and visualize project performance versus plan

  • Conduct what-if analysis and analyze alternative project plans

  • Cost Loaded Schedules

  • Critical Path Method (CPM) Scheduling

  • Critical Path Method Analysis

  • Delay Analysis and Quantification

  • Linear Schedule Analysis

  • Linear Schedules

  • Planned and As-Built Analysis Schedules

  • Preliminary Schedules

  • Program Management Schedules

  • Project Acceleration

  • Resource Loaded Schedules

  • Scheduling Updates

  • Time Impact Analysis

  • Total Float Management

Next
Next

Construction Project Management